Site cleanup
Remove specified debris, failed vegetation, excess soil and materials that cannot remain beneath the finished exterior.
Complete exterior construction after the home is built
The house may be finished while the exterior still feels like a construction site. Compacted soil, unfinished elevations, drainage gaps, bare ground and damaged access routes can make moving into a new home feel incomplete. PLS Landscaping coordinates the exterior as one construction plan, including grading, drainage, irrigation, sod, trees, planting, borders, walkways and final restoration.
Finish the property with the same care as the home
We review plans, access, elevations, utilities, drainage, irrigation and the finished exterior priorities during an onsite evaluation.
After the builder leaves
Material deliveries, excavation, concrete work and repeated equipment traffic change the soil and surface elevations around a new home. Installing plants or sod without correcting those conditions can conceal debris, low areas, irrigation conflicts and runoff paths that remain unfinished.
One coordinated exterior scope
Each service can be estimated separately, but the construction sequence should be planned as one exterior system.
Remove specified debris, failed vegetation, excess soil and materials that cannot remain beneath the finished exterior.
Correct high and low areas, establish foundation clearance and prepare final elevations for lawn, beds and surfaces.
Coordinate surface flow, downspouts, catch basins, solid pipe, swales and a responsible discharge route.
Install or modify zones, valves, controllers, spray heads, rotors and drip lines around the completed layout.
Prepare the living surface with appropriate soil correction, finish grading and sod selected for site conditions.
Build planting areas with suitable soil, intentional spacing and irrigation coordinated with the selected plant material.
Define beds, contain soil and manage selected grade transitions with stone, block or concrete construction.
Connect entries, gates and outdoor areas with pavers, concrete pads, gravel or other prepared-base surfaces.
Construct selected high-use or shaded areas with excavation, compacted base, drainage-aware elevations, edging and secure turf installation.
Coordinate low-voltage lighting, fence lines and gates with planting, access, utilities and the finished exterior plan.
Correct order of work
Drainage pipe, irrigation lines, valves, sleeves and electrical routes should be installed while the yard remains open. Grading and soil preparation follow the underground work. Borders, planting, sod, gravel and surface finishes are completed after the supporting systems and elevations are established.
When exterior services are contracted independently without a shared elevation plan, one installer may damage or conflict with another. A new walkway can block the drainage route. A border can trap water. Irrigation heads can end up inside future beds. Coordinated planning establishes the final layout before those conflicts are built into the property.
Construction and completed exteriors
These PLS photographs show underground drainage, a completed front landscape, an entrance walkway and a finished backyard surface.




From handoff to completion
The final sequence is adjusted to the plans, site readiness, builder schedule and selected exterior scope.
Inspect plans, access, utility locations, fixed elevations, soil and unfinished conditions.
Establish lawn, bed, tree, walkway, drainage, irrigation and restoration limits.
Complete cleanup, removal, excavation and broad grade correction.
Construct drainage, irrigation and applicable sleeves while the surface remains open.
Complete borders, walks, soil, trees, planting, gravel and finish grading.
Install sod or turf, test applicable systems, clean the site and review the finished scope.
Explore specific exterior systems
Houston service area
PLS Landscaping provides onsite evaluations for homeowners and builders in Houston and nearby communities. Availability depends on scope, construction schedule, access and location.
Depending on scope and location, PLS can coordinate grading, drainage, irrigation, sod, planting, trees, borders, walkways, gravel and related landscape construction as one exterior project.
Planning should begin before final site access closes and before exterior systems are installed independently. Early review helps coordinate elevations, drainage routes, sleeves, irrigation and material access.
PLS can review provided plans and compare them with visible site conditions. Scope, quantities, access and construction responsibilities must be confirmed before work begins.
Yes, when drainage is required. Underground collection and conveyance should be completed before finish grading, planting and sod protect the surface and make excavation more disruptive.
Pricing is based on measured quantities, plans, cleanup, excavation, access, soil, drainage, irrigation, materials, equipment, planting, surfaces and restoration. An onsite evaluation is required to define the complete construction scope.
Schedule an onsite evaluation
We will review the property, construction status, access, exterior priorities and systems required to complete the site in the correct order.
Quick Links |
Get in TouchCall or Send us a Message:
832-433-5863 Email Us: [email protected] Monday - Saturday 8:00am - 5:00pm |
We AcceptWe Accept All Major Credit Cards, Checks, and Online Payments
|