Backyard patios
Defined surfaces for seating, grilling and family gatherings, coordinated with doors, lawn and outdoor circulation.
Create durable access and useful outdoor space with the complete slab assembly planned first.
A cracked walk, undersized patio or missing service pad can affect how the family uses the entire property. PLS Landscaping constructs residential concrete patios, sidewalks, equipment pads and slab extensions around actual site conditions. We evaluate access, elevations, soil, drainage, utilities, irrigation and adjoining concrete before demolition or excavation begins. The scope can include removal, subgrade correction, base preparation, reinforcement, forms, concrete placement, control joints and restoration around the completed work.
★★★★★READ GOOGLE REVIEWSConcrete built for a specific purpose
A patio, walkway and equipment pad do not perform the same job. Loads, access, adjoining elevations and drainage affect the layout and construction method.
Defined surfaces for seating, grilling and family gatherings, coordinated with doors, lawn and outdoor circulation.
Continuous pedestrian routes between entrances, gates, driveways, patios, pools and service areas.
Level concrete support for approved outdoor equipment, utility uses or storage applications.
Additional concrete connected beside an existing patio, walkway or service surface after the original edge and elevations are evaluated.
Concrete flatwork construction
Concrete should not be used to conceal weak soil, buried debris or an unresolved low area. The preparation must support the slab and its intended use.
Existing concrete and unsuitable material are removed, with access and disposal planned around the residence.
The work area is opened to the required depth, shaped and compacted where appropriate. Soft areas are addressed before closing the base.
Applicable selected material is placed and compacted to support the planned slab elevation and drainage pitch.
Forms establish limits and grade. Reinforcement is positioned according to the approved residential flatwork scope.
Concrete is placed, consolidated and finished with the selected surface texture while slopes and transitions are maintained.
Planned joints are completed, forms are removed at the appropriate stage and disturbed lawn or beds are restored as specified.
Drainage and transitions
Finished concrete must shed water without directing it toward the home, trapping it against a fence or creating a low strip at the lawn. Surface pitch is planned first. Channel drains, catch basins or solid drainage pipe may be incorporated when surrounding elevations block a responsible open route. Existing downspouts and irrigation should also be considered before forms are set.
PLS project work
These photographs show separate parts of residential flatwork: a completed patio, fresh concrete placement, a finished access walk and reinforced preparation before a larger pour.




Construction sequence
Utilities, drainage and irrigation must be considered while the site is open. The finished slab should be the result of the plan, not the place where conflicts are discovered.
Review use, dimensions, access, utilities, irrigation, soil, elevations and runoff.
Define slab limits, thickness requirements, steps, joints, transitions and drainage.
Remove materials, excavate, correct the subgrade and install applicable base.
Set forms and reinforcement, place concrete and complete the approved finish.
Control access during curing, remove forms and restore surrounding surfaces.
Useful space for everyday family life
A properly planned patio can give the family dependable room for outdoor meals, celebrations and relaxed evenings. Walkways create cleaner access for children, guests and pets between the home, driveway and backyard. Equipment pads and extensions solve practical needs without leaving the exterior feeling improvised. The result should support the household while fitting the property around it.
Related residential construction
Before construction begins
Often, yes. The existing slab condition, elevation, edge, drainage and intended connection must be evaluated. The new work should not trap water or create an unsafe transition.
Concrete demolition and removal can be included. Access, slab thickness, reinforcement, disposal and nearby improvements affect the demolition scope.
Reinforcement requirements depend on the application, dimensions, support conditions and approved construction scope. The complete slab assembly should be selected for its intended residential use.
Yes. Applicable channel drains, catch basins, solid drainage lines or sleeves should be installed and tested while the work area remains open.
Concrete gains strength over time. Access depends on the application, weather, mix and project conditions. The required protection period is reviewed for the specific installation.
Yes. PLS Landscaping serves Kingwood and nearby northeast Houston communities. Project availability depends on scope, access and location.
Request an onsite estimate
We will measure the proposed area and review access, existing concrete, soil, elevations, drainage and surrounding improvements before defining the recommended flatwork scope.
Quick Links |
Get in TouchCall or Send us a Message:
832-433-5863 Email Us: [email protected] Monday - Saturday 8:00am - 5:00pm |
We AcceptWe Accept All Major Credit Cards, Checks, and Online Payments
|