Concrete patios
New patios and extensions planned around seating, doors, roof runoff, lawn transitions and access.
Houston, Texas and nearby areas
Permanent concrete changes how people, equipment and stormwater move across a property. Before a patio, driveway, walkway or pad is built, PLS Landscaping evaluates access, demolition, soil elevation, fixed transitions, roof runoff and surrounding restoration. The objective is a usable surface that belongs in the complete site plan.
What the surface is telling you
Not every crack means the same thing, and replacing concrete inside the same footprint does not automatically correct the cause. We review edge support, roots, washout, adjoining grades and drainage before defining removal limits or a new layout.
Vehicle loading, inadequate support and adjoining soil loss can weaken perimeter sections.
Poor elevation at doors, lawn edges or drains can hold runoff on and beside the slab.
Settlement, roots or incompatible connections can leave uncomfortable changes in elevation.
Selected residential equipment and storage areas may require a stable, properly located pad.
Residential concrete scope
Gathering surface
New patios and extensions planned around seating, doors, roof runoff, lawn transitions and access.
Vehicle surface
Selected replacement or new construction coordinated with garage elevation, approach and drainage.
Daily circulation
Stable routes between entries, gates, driveways, service areas, patios and backyards.
Targeted support
Defined pads for applicable equipment, utility access, storage or small residential service areas.
Permanent surfaces need coordinated infrastructure
Drainage pipe, irrigation sleeves, downspout routes and future utility access are difficult to change after permanent concrete is installed. The planning stage should identify these conflicts.
Determine whether surface slope is sufficient or collection and pipe conveyance are required.
Relocate conflicting components and install applicable sleeves before the slab closes the route.
Remove unsuitable material and prepare support for the intended use and project design.
Finish grading, soil, sod, turf or planting must meet concrete edges without trapping water.
Construction before the pour
These unique project photographs focus on site preparation, soil correction, access and drainage work completed before permanent hard surfaces.




Construction sequence
Review use, access, utilities, drainage and fixed elevations.
Demolish selected concrete and excavate the new construction area.
Build support, set forms, establish slope and coordinate infrastructure.
Install applicable reinforcement, concrete, finish and joint layout.
Protect initial curing and complete the defined landscape restoration.
Related Houston services
Use these separate pages when the broader project requires drainage, turf, landscape construction or grading.
Houston residential concrete construction
PLS Landscaping provides onsite estimates throughout Houston and selected nearby communities. Project availability depends on construction scope, access, location and the site conditions that must be coordinated around the concrete work.
Houston concrete questions
Yes, when access and project conditions are suitable. Demolition limits, disposal, subgrade, adjoining improvements and replacement elevation are reviewed onsite.
There is no universal specification for every slab. Intended use, load, dimensions, soil, base, reinforcement, local requirements and project design determine the applicable assembly.
Finished slope, runoff volume, doors, foundations, downspouts and discharge options are reviewed. Surface grading, channel drains, catch basins or pipe conveyance may be required.
Yes. Individual pads can be integrated with gravel, turf or planting when the spacing, base, edge conditions and intended walking use are planned before installation.
Yes. The defined scope can include grading, soil, sod, turf, irrigation adjustments, gravel or planting after construction access and final elevations are established.
The onsite estimate considers measured quantities, demolition, access, excavation, disposal, base, forms, reinforcement, concrete volume, finish, drainage coordination and restoration.
Evaluate before the pour
We will review the proposed use, access, elevations, drainage and surrounding restoration before defining the construction scope.